Today, I worked to get the two aft wraps in place and then trimmed, from Bulkhead G to H. The lower one was easy, as I could stand on the table and work from above. The lower however, required me to look up from underneath. Again, my Ruth helped quite a bit. Now I need to drill everything out to #30, disassemble, debur, prep, clean and prime.