I spent the last several days installing a new air compressor, a single stage 60 gal Porter Cable. I'm thinking ahead about painting and found this one at a very good price, $425.00.
Today, I worked to install the front float fittings. What a bear! There is no room to really get a wrench on any of the nuts/bolts. I had to torque the heads vs. the nuts. In picture one, you can see the tight nut pattern -- difficult to even get a box end wrench on them. In picture two, you can see how the drag link just fits (with a bit of filing) between the two outer float fitting attach bolts. I had to install the two outer bolts, then align the heads for the drag link to fit, and then bolt the drag link in place before installing the long tail piece on the drag link. The small AN-3 bolts that bolt the drag link mod together just fit from in to out. I still have the forward float fitting on the left to install.