Today, I spent some time cutting the sills to fit. To assist, I moved the side panels up several rivet holes. This was to keep the station 5-8 flanges in their correct vertical position. I installed them with cargo straps, to help keep the bottoms flush with the bottom skin. Tomorrow, I'll begin match drilling with a long 12" bit from the inside.