Finally, after an extended trip back east, I was able to get back to work. I installed the outboard leading edge, and then worked on the root leading edge rib, installing the delrin bearing with nutplates, and then installing the stiffener.
In addition, my team began work on my new hangar at the Bowling Green MO airport. Picture attached. The Edwards family from Elsberry, MO is building it for me. 50 x 50 feet with a Cool-Air Horizontal Stacker Door.