Today, I spent some time locating and installing the battery box and ground bus. I drilled holes for the battery box and installed #4 nutplates behind the firewall. In addition, I located and installed the ground bus above and behind the battery. Finally, I located the contactors and began to install. As usual, I'm awaiting correct size hardware from ACS.