Today, I spent some time installing the lock nuts and washers on the exhaust manifolds and then tightening them up. Next, I installed the prop, mixture and throttle from McFarlane Aviation. They are really nice, but very expensive. Next, I need to make a bracket to hold the throttle and mixture cable. I also cleaned some paint off the bottom of the oil sump, and installed the two Reif Heating pads with expoxy. This needs 48 hours to cure.