Powered By Kitlog Pro v2.0
Ebby's Hatz Classic
Classic
Fuselage
1-17-2005
< Previous Log Entry
Next Log Entry >
Date:
1-17-2005
Number of Hours:
1.50
Manual Reference:
Brief Description:
Landing Gear-Spring retainer.
These bushings were machined at work. The V-block held the bushing for marking and drilling. A small pilot hole was drilled first followed by a larger hole which was then reamed to final dimension. Four of these are needed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Classic Home
Category
# Logs
# Hours
All
239
616
Cowling
3
6
Empennage
69
196
Engine
4
11
Firewall Forward
7
24
Fuselage
141
346
Instruments
6
12
Shop Supplies
5
12
Systems
1
1
Tools
1
4
Wings
2
4
Copyright © 2001-2024 Matronics. All Rights Reserved.