Powered By Kitlog Pro v2.0
Ebby's Hatz Classic
Classic
All
12-13-2003
< Previous Log Entry
Next Log Entry >
Date:
12-13-2003
Number of Hours:
5.50
Manual Reference:
Brief Description:
Right elevator panel
Good progress. All parts for the right side of the elevator are laid out and ready to tack. Extra length was left on the hinge spar until the final fit is attempted. The tubing work gets pretty crowded near the inboard hinge.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Classic Home
Category
# Logs
# Hours
All
239
616
Cowling
3
6
Empennage
69
196
Engine
4
11
Firewall Forward
7
24
Fuselage
141
346
Instruments
6
12
Shop Supplies
5
12
Systems
1
1
Tools
1
4
Wings
2
4
Copyright © 2001-2024 Matronics. All Rights Reserved.