Powered By Kitlog Pro v2.0
Ebby's Hatz Classic
Classic
All
12-15-2003
< Previous Log Entry
Next Log Entry >
Date:
12-15-2003
Number of Hours:
1.00
Manual Reference:
Brief Description:
Elevator details
As in each part of this project, the detail are varied and each requires thought and patience. It seems a waste to only build one airplane after learning how to perform these procedures.
Trailing edge material fits into spar at end
3 Blocks can be used as a friction clamp
Ribs are notched to fit the spar.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Classic Home
Category
# Logs
# Hours
All
239
616
Cowling
3
6
Empennage
69
196
Engine
4
11
Firewall Forward
7
24
Fuselage
141
346
Instruments
6
12
Shop Supplies
5
12
Systems
1
1
Tools
1
4
Wings
2
4
Copyright © 2001-2024 Matronics. All Rights Reserved.