KitLog pro

Powered By Kitlog Pro v2.0

Jimmys CH750 builder log
' style=
Date:  12-18-2010
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Rudder brackets, hrz stabilizer, elevator

Competed installation of nosegear steering rods. Installed rudder brackets & rear fuse angles.Installed Hrz. Stabilizer & Elevator. Used roary file to grind elevator horn to allow 28 degree up/down travel deflection. Strapped elevator & hrz stab. to nuetral position in order to begin control cable installation. This work was done over a 2 day period.

Total hrs. to date: 396
' style=

rudder brackets, elevator horn

rudder brackets, elevator horn

' style=

hrz. stab. & elevator locked at nuetral position

hrz. stab. & elevator locked at nuetral position

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.