Powered By Kitlog Pro v2.0
Jimmys CH750 builder log
CH750
All
12-15-2010
< Previous Log Entry
Next Log Entry >
Date:
12-15-2010
Number of Hours:
5.00
Manual Reference:
Brief Description:
nosegear, control rods
Completed nose gear installation with bungee cord and steering rods. Bolted up rudder pedal bearings and greased. Bolted up engine mount brackets. Installed control yoke stick and flaperon control rods for initial fit. 6 hrs.
Total hrs. to date: 386
outside for the first time.
Wing aileron/flap controls
Rear elevator control bellcrank
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH750 Home
Category
# Logs
# Hours
All
107
701
Avionics
3
64
Cabin
3
16
Empennage
18
87
Engine
5
122
Firewall
4
22
Flight Controls
3
23
Fuselage
39
186
Miscellaneous
1
1
Wings
31
180
Copyright © 2001-2024 Matronics. All Rights Reserved.