Powered By Kitlog Pro v2.0
Jon's Skybolt Project
Skybolt
All
7-25-2015
< Previous Log Entry
Next Log Entry >
Date:
7-25-2015
Number of Hours:
2.00
Manual Reference:
Brief Description:
Glued the aileron ribs in place
Made some 6.5 degree clamp blocks to hold the aileron ribs at the correct angle while gluing. Each rib was then glued. Used the laser level to make sure all the ribs were correctly aligned.
Special 6.5 degree clamp blocks
Glued in position
Laser for leveling
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Skybolt Home
Category
# Logs
# Hours
All
152
276
Empennage
2
3
Fuselage
5
8
Miscellaneous
3
Rigging
13
26
Shop Supplies
1
Tools
1
2
Wings
124
226
Workshop
3
11
Copyright © 2001-2024 Matronics. All Rights Reserved.