KitLog pro

Powered By Kitlog Pro v2.0

Vans RV-8 G-JBTR
' style=
Date:  8-6-2008
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Wing Cradle

I remember whilst doing the research and looking at other websites noting the milestone of placing the wings in the cradle. I can vouch that it is a great feeling of achievement when you reach this stage - truly one of the milestones of the build project.

I followed the plans for the cradle except I added soft rubber castors with brakes (same as I used on my work island). This time I bought them from Homebase (new large store just built 400 metres from the house!). I also bought some pipe insulation (22mm dia - 13mm wall x 1 metre x 3) which fitted perfectly for each leading edge cut out on the 3/4" chip board, that was from Wickes - next door to the new Homebase - jolly decent of them to build them so close! The 4" x 2" was all recycled from the wing stand. I added 1/2" all round the aerofoil/spar cut out to accept the pipe insulation and it fitted like a glove.

It made a nice change working with wood; the build experience is definitely improving my skills as I never looked at the drawing once I started - the pre-planning had simply lodged into the grey matter and off I went - solo. Very satisfying.
' style=

Wings Off the Stand

Wings Off the Stand

' style=

Da Da

Da Da

' style=

Major Milestone

Major Milestone

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.