KitLog pro

Powered By Kitlog Pro v2.0

Vans RV-8 G-JBTR
' style=
Date:  2-27-2008
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Right Fuel Tank Session 6

Session 6 (Semkit)

* Pop rivetted baffle and Z brackets (3 hours Temp 10 Deg C)
* 100% clecod end Z brackets

No problems encountered (covered AD 41/42 pop rivets after squeezing baffle rivets)

I had read that a few people have had baffle alignment problems, caused by the fact that there are no dimples to locate into each other. I therefore decided to put a rivet in the centre hole (top and bottom) and moved the baffle until they were perpendicular. Then I 100% clecod the baffle.

As with all my sessions I spent almost as much time planning/doing a dry run as I did sealing/rivetting; this certainly reduced the associated stress levels dramatically. Part of that planning included double checking the Z Bracket alignment and marking the baffle and Z Bracket with matching orientation and rivet call out.
' style=

3/16

3/16" Bead of Sealant

' style=

Baffle Alignment with rivet

Baffle Alignment with rivet

' style=

Z Bracket Marking

Z Bracket Marking

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.