Powered By Kitlog Pro v2.0
Jacks Web Site
RV-7A
All
1-2-2007
< Previous Log Entry
Next Log Entry >
Date:
1-2-2007
Number of Hours:
4.00
Manual Reference:
8-3.9-14
Brief Description:
Started F-706 bulkhead
Enlarged the holes in all the remaining bulkheads as required. Fabricated the F-729C angle and drilled the F-729A and B parts. Drilled the F-728A and B parts as well. Assembled these parts onto the bulkhead for drilling.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
728
2689
Canopy
26
127
Electrical
97
436
Empennage
30
110
Firewall forward
103
332
Fuselage
161
696
Gear fairings
5
17
Instrument Panel
78
419
Shop Setup
15
Wings
213
552
Copyright © 2001-2024 Matronics. All Rights Reserved.