Spent a couple of hours working on the fuel tank vent lines and the fuel pickup lines. Straightened the aluminum tubing and cut it to length. Bent the vent lines to meet the attach point. Drilled holes in the end tank ribs suitable for mounting the AN fittings. Ordedred a flarring tool for the tubing.