Mounted the Dynon roll servo into the right wing. This required replacement of one of the existing brackets and replacing it with the servo bracket. Mounted the servo. Drilled the existing control bracket for the servo attachment point. Assembled the links and levers with final hardware. Torqued the bolts and marked them.