KitLog pro

Powered By Kitlog Pro v2.0

Jacks Web Site
' style=
Date:  5-22-2010
Number of Hours:  6.00
Manual Reference:  ?
Brief Description:  Finished lower ignition system installation

I made the plates to secure the grommets. I then drilled holes in the plates through the baffles for 6-32 screws. I prepared nutplates in the inside of the baffles. I then measured the required lengths of the leads so that I coujld get replacements.
' style=

Measured lead lengths

Measured lead lengths

' style=

Fabricated attach plates

Fabricated attach plates

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.