Spent the afternoon installing the oil cooler to the back of the baffles. This included making the spacers for the bolts and preparing the nutplates for attachment. Cut the clearance area from the upper inside flange. Match drilled the mounting plate to the baffle. Attached the fittings to check hose clearance.