Date:  2-28-2010
Number of Hours:  2.00
Manual Reference:  ?
Brief Description:  Preparing snorkel transition form and first layup

The next step was to cut down the foam enough to add about 1/16" of bondo to form a smooth transition form. I sanded the bondo to be approximately even with the internal edges of the snorkel halves. I then added the first layup of fiberglass to the form. I added about 4 layers of glass. The first three were fit inside the gap in order to fill it. The last layup extended 1/4" on either side of the form.
' style=

Foam blocks cut down

Foam blocks cut down

' style=

Body putty applied and sanded

Body putty applied and sanded

' style=

First layup applied

First layup applied

' style=