KitLog pro

Powered By Kitlog Pro v2.0

JIM'S WEB SITE
' style=
Date:  1-26-2006
Number of Hours:  12.00
Manual Reference:  8-17 DWG27
Brief Description:  Empennage Installation

RECEIVED THE F-681 FROM VANS. DRILLED OUT THE OLD F-681 AND RIVITED THE NEW ONE IN PLACE. MOUNTED THE VERTICAL STABILZER (VS-802) AND CLAMPED IT IN PLACE. VERIFIED THAT THE RUDDER FIT AND MOVED SMOOTHLY. THEN DRILLED THE 4 ATTACH BOLTS IN THE FWD SPARS (HS-602) OF THE HOROZONTAL STAB. REMOVED SAME AND CLEANED ALL PARTS.INSTALLED THE RUDDER CABLE CLAMP AND PLASTIC SLEEVETO EACH SIDE. INSTALLED AND RIVITED THE "MODIFIED" 810 BULKHEAD IN PLACE. REINSTALLED THE HOROZONTAL STAB FOR FINAL BOLTING.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.