KitLog pro

Powered By Kitlog Pro v2.0

Ivans RV 10
' style=
Date:  10-13-2007
Number of Hours:  1.00
Manual Reference:  10-22
Brief Description:  Steps 1 & 2

Rivet F1011B Stop/ Doubler to Aft deckand the flange of F1011 Bulkhead.

Temp. bolted F1011D Attachment Bar Support to F1011B Stop/ Doubler, Aft Deck and Longerons.

Match drilled holes from F1011C Hor. Stab Attachment Bar into attachment support angle #30 then final drilled #12. Removed and Deburred.

Riveted the support angfle to the stop/doubler and aft deck
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.