KitLog pro

Powered By Kitlog Pro v2.0

Ivans RV 10
' style=
Date:  12-30-2006
Number of Hours:  4.50
Manual Reference:  6.2-4 to 6.3-2
Brief Description:  Vertical Stabilizer Skeleton

debrred egdes of all parts in step 4 then clecoed together VS1008, VS1014L,R, VS 1010 Bottom Rudder Hinge Brackets and VS1011 Middle Rudder Hinge Brackets to VS1003 Rear Spar. Clecoed VS1012 Top Rudder Hinge Bracket and VS1017 Hinge Doubler to Rear Spar.

Final drilled all holes needed in steps 4 &5 Then matched drilled holes in Step 5.

Machine countersunk #30 holes in of VS1008 foper 1/8 fluish rivets.

Prepared the rest of the skeleton parts needed to complete Steps 1 & 2 of 6.3.
Final drilled all holes common to the skeleton and skins using #30 drill.

Emma helped for 1.5 Hours!
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.