Packed up the trim tabs, bearings, actuator rods and hardware and the elevators. Took them to the hangar for storage. Loaded up the wing wood crates on the trailer and brought them to the garage. Took some ingenuity to do it solo. Installed 2x4's on top of the harbor freight sawhorses. I didn't care for the lack of stability so went to home depot and snagged four heavy duty sawhorses. Much better. Moved some shop equipment around to better utilize the space required for the two lower wings' construction.