Marked and cut inspection holes for both walkways. Trimmed walkway skins even with the front edge of the front spars. Applied 1st coat of Clear Coat to what will be the inner face of both skins. Marked centerlines on the rear spars for cove block installation. Marked longitudinal centerlines on cove block stock to aid with installation in the near future. Cut angled clamping blocks for use on the trailing edges when glue time comes shortly.