KitLog pro

Powered By Kitlog Pro v2.0

Peters RV7A
' style=
Date:  4-1-2007
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Leading Edge Fitting

Now that I need the tank parts to dry I decided to fit the leading edge on permanently. I had my two lovely children help and this speeded things up a bit. I had Alexander place the correct rivet size into the holes (His little fingers worked a treat in placing the small rivets in) I squeezed them with the hydraulic squeezer and my daughter Imogen pulled out the cleco's as we went.
After this I finished deburring and dimpling the underside ribs and then ran the electrical conduit through the holes I made in the ribs.
' style=

Future Builder?

Future Builder?

' style=

Two Helpers

Two Helpers

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.