KitLog pro

Powered By Kitlog Pro v2.0

Peters RV7A
' style=
Date:  9-25-2006
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Left Tie Down

Installed the left tie down, riveted parts together and then bolted to the spar with appropriate parts. I will do the right spar tie down when I have finished the left wing.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.