KitLog pro

Powered By Kitlog Pro v2.0

Peters RV7A
' style=
Date:  4-8-2008
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Baggage Area

Scotchbrited and cleaned up the forward side covers, alodined and prepped ready to prime. Riveted on the two rear side covers and just gave a touchup with the primer on the steps on the inside.
Just reading the plans on fitting the baggage floors with correct rivet and nutplate call outs. OK Drilled out appropriate holes in the right hand side baggage floor, dimpled the holes with nutplates and dimpled the holes in the rear where it attaches to the rear bulkhead. Scotchbrited, alodined and primed, riveted to the floor. Repeated the process for the left baggage floor. Just before I riveted the left floor down I ran some corrugated conduit under the floor just in case I need to run extra wires for an autopilot. Finished riveting the rear top skin with the help of my good friend Peter McBain.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.