Completed steps 3 and 4 and part of step 6 page 28iS/U-04.Hooked foward end of lines to brake master cylinders on left side.
Step 3: Riveted the F-12103 Tunnel Brace to the fuselage tunnel as shown in Figure 2. Step 4: Installed a snap bushing in the right-most hole in the F-12103 Tunnel Brace flange as shown in Figure 2 Step 6: As shown in Figure 2, the F-01289C-L-1 & -R-1 Main Brake Lines run from the F-01204A-1 Center Section Bulkhead to the brake master cylinders on the left side of the fuselage. Routed the main brake lines forward through the snap bushings and F-01276C-1 System Blocks to the left side master cylinders. Mark both ends of the left and right brake lines with an "L" or an "R", respectively.
Completed step 1 page 28iS/U-05
Step 1: Secured the F-01289C-L-1 & -R-1 Main Brake Lines to the lower elbow of both left side master cylinders as shown in Figure 1.
Completed step 1 page 29iS/U-02
Step 1: Made the F-01201J-1 and F-01201K-1 from AN257-P4 piano hinge per the dimensions in Figure 1. Removed the hinge pin before cutting the parts to length.