Brief Description: F1206A bulkhead and baggage ribs
Completed step 14 page 21-02. Riveted bearing bracket assemblies from F-1206D brackets and com-3-5 bearing per Figure6. Completed step 1 page 21-03 – riveted F-1206A bulkhead to F-1222-L&R and F-1223-L&R baggage ribs per Figure 1. Completed step 2 – riveted the F-1206G-L&R baggage ribs to the F-1206A bulkhead and F-1221-L&R baggage ribs per Figure 1. Completed step 3 – dimpled holes in the top flange of F-1206H-L&R to correspond to dimpled holes in the F-1224-L&R baggage floors. Completed step 4 – riveted the F-1206H-L&R baggage ribs to the F-1206A bulkhead per Figure 1. Completed step 5 – riveted the F-1224-L&R baggage floors to the F-1206A bulkhead and F-1206H-L&R ribs using the rivets called out in Figure 2. Started step 6 – dimpled 5 – K1100-08 nutplates. Installed 3 with CCR264SS-3-2 rivets. Fit F-1206F bearing bracket brace to F-1206A bulkhead and riveted per step 7 and Figure 3. Fit-up the F-1206F brace to the F-1206G-L&R ribs and the bearing bracket assemblies per Figure 3.