Step 4: Bolted F-1204R to F-01204B-L using the hardware called out in the Figure 2 detail. Step 5: Rivetedt the Left and Right Seat Floor Assemblies to F-01204A-1 Center Section Bulkhead using the rivets called out in Figure 2. Rivet call-outs applied to both sides of the fuselage.