Completed step 4 – clecoed then riveted the forward trimmed W-1208-L nose rib to the W-1206-L spar assembly and attach angle. Completed step 5- clecoed the forward and aft trimmed W-1208-R nose rib with attached nutplate and W-00028 doubler plate to attach angle. Completed step 6 – clecoed then riveted the left stub spar assembly to the forward flanges of the W-1208-R and W-1208-L nose ribs per Figure 1. Completed step 7 – installed 14-SB375=4 snap bushings in the W-1208 nose ribs.