KitLog pro

Powered By Kitlog Pro v2.0

HANSRUDOLF'S WEB SITE
' style=
Date:  10-25-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Avionics - Wiring 1/2

Avionics Wiring:

For the purpose of preparing the wiring looms for the various avionics connections and interfacing, a temporary frame was made up to allow mounting of the Instrument Panel and the associated sub panels, such as the Avionics Tray and and the Power Distribution Panel in its relative positions to each other. The wiring loom will then be completed and the functionality of the total system checked before the various units are installed in the aircraft.
' style=

Instrument Panel mounted on support frame, ready for wiring

Instrument Panel mounted on support frame, ready for wiring

' style=

Preparation of Wiring Diagrammes

Preparation of Wiring Diagrammes

' style=

Early Stage of Wiring Loom

Early Stage of Wiring Loom

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.