Brief Description: Flightline AC, Evaporator to Overhead Transition W
Feb 21, 2012, worked 2 hours. Apparently the brain storming paid off at least for now. I made a couple more cuts on the largest of pieces cut off from the overhead. I trimmed the three flanges from the main overhead section that would normaly butt up to the baggage bulkhead. The side flanges are cut off to 7/8″ measured parallel to the flange. Both sides of the overhead were cut off. I then cut off the rear flange section measured 3/4″ parallel to the flange. This left three pieces that I can attach individualy to the overhead that will be used as the skeleton for the over all transition piece. Pictures are attached to help explain the process.