Brief Description: Flightline AC, Evaporator and Overhead Transition
Friday 22nd, 2013 (2 hours.) I took the backer/closeout piece of fiberglass that connects to the face of the evaporator and cut the two air exhaust holes. Added the three holes for mounting the piece directly to the evaporator. I then proceeded to drill and cleco all the pieces together while they were in place.