1. Lots of pop rivets. Ones nearest to the flanges were pulled manually.
2. VS-1202 and VS-1207 are joined. We now have a skeleton.
3. Inside view of the same joint. Note the yellow guck. I'll need to squeeze some into the side tabs that will eventually be riveted to the spar flanges.