Picture 1 shows the intercom and the ELT remote swich both wired up. Some fiddling with small wires. Will require care if I need to undo anything.
I also riveted the map box to the right panel in so far as I could with the rivet squeezers. There's half a dozen rivets that cannot be reached with 3-inch squeezers. The plans call for using flush pop-rivets, but I think that will look a bit messy. Not sure whether to try and get someone to buck them - this will require removing the panel and taking some bits off again. Not a big deal but will require care.
Picture 3 shows the completed panel, bar those 6 rivets. Engine controls come later...