Decided on a basic placement for the flap position sensor, and clamped it in place, while waiting for a cushion clamp from spruce. Then I figured out how to run the AOA line to the pitot tube, and ran that line, and flared the pitot tube aluminum tubes for both the pitot and the AOA. Attached the control module for the heated pitot tube. Found the terminals for the EGT and CHT probes, in the box, of course.