KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  12-11-2006
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Left tank

Removed left tank from the wing, and match drilled all holes to size. Removed attach brackets, and drilled both tanks attach brackets for platenuts. Cleaned and deburred, and counter sunk holes for rivets on back side of bracket. Primed platenuts and attach brackets for both tanks. Started riveting platenuts to attach brackets. There are 3 platenuts done, and 33 to go.
' style=





' style=

one down...

one down...

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.