Primed left ribs and tie down bracket. Cleaned left ribs and primed them too. Installed both tie down brackets and torqed bolts to 25-30 inch pounds. Taped over the reinforcement brackets on the main spar, in preparation for riveting. Cleco'd in all the ribs, facing up from the main spar. I think I'll be able to rivet them like that on the stand.