KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  11-18-2006
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Prime time

Primed left ribs and tie down bracket. Cleaned left ribs and primed them too. Installed both tie down brackets and torqed bolts to 25-30 inch pounds. Taped over the reinforcement brackets on the main spar, in preparation for riveting. Cleco'd in all the ribs, facing up from the main spar. I think I'll be able to rivet them like that on the stand.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.