KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  1-29-2008
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Screws

Basically, just screwed in all the parts that I primed yesterday. Found one place on the 705 bulkhead that I riveted on platenuts, when I was supposed to rivet them on the flap back brace. So, I removed those rivets and put the platenuts where they are supposed to be. Then I pop riveted in the lower aft baggage compartment side covers, and screwed in the forward side covers. Finally, I fabricated the control stick boot rings, and got the right one done. I then riveted on the platenuts on the right seat bottom for the boot rings. Spoke with Craig Vincent, moderator from Van's Airforce.net about the flexible fuel lines that we are opting for, and got some advice on installing those. Last, I replaced the seat backs that I had removed for the flap installation. The baggage compartment is pretty much done now, awaiting wiring and pitot static plumbing. That finishes out January of '08, only 27 hours this month, off my 40 hour average, but over the life of the project, I'm still averaging 40 per.
' style=

Baggage Compartment

Baggage Compartment

' style=

Yellow Cover is for ELT

Yellow Cover is for ELT

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.