KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  12-28-2007
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Console, Seats

Finished riveting the console together, installing the fuel lever plate, and the throttle quadrant. Had to fab some spacers to get the quadrant to line up right, and that took a little trial and error. Then, getting the washers and spacers on the bolt, down in the bottom (top, upside down) of the quad wasn't easy. I think I'll have to take it out again to upholster, but if I can avoid it, I will leave it as is. Then I started in on the seat backs, and got all the parts fabricated, and all the holes drilled. I just have to go back and drill to #30 final size, deburr and prime, and rivet those guys together. I had to re-do one of the bottom hinges, to make the seats line up with the correct spacing. I think I messed up when I measured the bottom hinges on the seat floors, or else the console attach holes aren't exactly in the center, and so the spacing on the right seat was much tighter than the left, until I re-did the bottom hinge, moving the "hinge loop" over by one space. Now there is about an inch on both sides of the console.
' style=

Console and Seats

Console and Seats

' style=

Seats

Seats

' style=

From the back

From the back

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.