KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  11-13-2007
Number of Hours:  1.75
Manual Reference:  
Brief Description:  Riveting Aft Deck

Riveted on the aft deck to the fuselage and the 709 bulkhead to the aft deck. The aft deck is where the tail parts get mounted, so I took my time riveting that on. They also connect to the thick bars that are riveted to the longerons and the tail, so it's pretty sturdy, but still. Spent a little time on the panel, planning and dreaming. Right now, I like the MGL Voyager EFIS, 2.25 inch backup instruments, Garmin SL30 Nav/Com, Garmin 330 Xponder, PS Engineering's PMA9000 audio panel, Vertical Power VP-100 Electrical Management System, Trio Auto Pilot and Altitude Hold, and Grand Rapids Engine Information Display. On the center pedastal, I'll mount the throttle, and the Electric Prop Controller. Below the panel, above the pedastal, I'll mount the Aux Battery Switch, Ess. Bus Master Switch, Ignition Switch, Main and Aux. Fuel Pump Switches and the Start Button. All Circuit Breakers will be mounted to the right of the EIS.
' style=

Christmas Wish List

Christmas Wish List

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.