KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  11-12-2007
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Aft Deck Drilled

Got my smart level out and leveled the fuselage. Last night, I made a short sawhorse (22 inch) for the front and used a regular sawhorse for the tail, slid it forward until the longeron over the center section was perfectly level. Laterally, the fuselage was perfectly level. Leveled the tail, and again, 0.0 degrees of twist. Clamped the aft deck and drilled and cleco'd. Removed, and match drilled the spacers I fabricated to the aft deck, and then to the bulkhead angles. Riveted on the angle to the 711 bulkhead. Deburred and primed the spacers and the aft deck, and cleco'd back in position. Ready to rivet. Considering waiting for rudder cable access reasons, but there are large holes in the aft deck for that purpose, so I'll probably just rivet that guy on.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.