KitLog pro

Powered By Kitlog Pro v2.0

GOTTFRIED'S WEB SITE
' style=
Date:  12-2-2015
Number of Hours:  1.00
Manual Reference:  
Brief Description:  landing gear/fuselage alignment

Spend another hour trying to get the landing gear aligned properly. The goal still is to get the 50-51" at the tail boom, have both skide parallel enough to have the tips within a 1/4" of eachother when measured to the ground. Changed the spacer blocks between the lower longerons and the rear gear legs to 7/8" and between the suare bars and the front gear legs to 3/8". the distance between the front of the rear gear shoe and the back of the front gear shoe between 41" and 42".
I guess this is about as good as it gets. I will check one more time all dimensions and will drill the holes to finish the gear installation.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.