KitLog pro

Powered By Kitlog Pro v2.0

GOTTFRIED'S WEB SITE
' style=
Date:  1-14-2019
Number of Hours:  2.00
Manual Reference:  
Brief Description:  painting and transmission assembling

Also prepped and painted the lower rotor shaft to protet it from corrosion.
Also einstalled oil lines after cleaning them up. Used teflon tape to seal tapered connections
' style=

reinstalled oil lines

reinstalled oil lines

' style=

lowerrotorshaft painted

lowerrotorshaft painted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.