KitLog pro

Powered By Kitlog Pro v2.0

GOTTFRIED'S WEB SITE
' style=
Date:  8-4-2017
Number of Hours:  1.00
Manual Reference:  
Brief Description:  oil tank assembly

Mixed the Resin and hardner per spec and wetted fiberglass mat and the respective tank shells. Cut the wetted fiberglass mat with roller as marked.Used 2 strips of mat between the tank halves and then clamped the shells together, checked alignment and let the cure over night.
' style=

cutting wetted strips

cutting wetted strips

' style=

laying down 2 strips all around

laying down 2 strips all around

' style=

Clamping halves and final alignment check

Clamping halves and final alignment check

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.