Eagle R&D provides 2 fiberglass shells, which need to be epoxied together to become the oil tank for the Solar turbine and its transmission. I cleaned up the 2 fiberglass shells and checked them for fit. Next I laied out the fiberglass mats and marked them where I need to cut stripes of wetted mat to go between the tank shells.Prepared everything needed to epoxy the 2 halves together