Torqued and sealed sensor fittings. Reinstalled front baffle support bracket loosely using forward top case bolt; bracket will be tightened, torqued and sealed after baffle installation is finished. Studied HotStrip mounting instructions; tested methods of removing paint from oil sump where HotStrip will be epoxied. Began crankcase heating process using HotBands, oil radiator below engine and blanket on top of engine.