KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  3-30-2018
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Cockpit Heat Selector Box Work pt. 4

Inspecting the heat selector box installation made me realice that the incoming hot air would be directed at the brake lines, fuel pump, lines and wiring. I began fabricating a diverter cuff that would redirect the air toward the center of the fuselage. Bent some aluminum stock into a C shape, smoothed edges and cut a slot for actuator cable passthrough. Fabricated the first mounting bracket; prepped and primed the mating surface and riveted it in place.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.